Has flat tabs that have faded and lost their shine
Shingles in fair condition can take an approved coating that extends their service.
Offices · Churches · Strip Centers
We coat asphalt shingle roofs on Nicholasville offices, churches, and strip centers when the shingles still lie flat and the coating maker approves its product for them.

Shingle coating has a narrow gate. These cards show which commercial shingle roofs pass it and which ones go another way.
Shingles in fair condition can take an approved coating that extends their service.
Water concentrates at valleys and flashing, so those get repaired before any coating decision.
The shingle section and the metal section get separate systems, each matched to its surface.
Coating will not fix failed shingles. Replacement is the right call.
Several of these conditions end the coating conversation. We check every slope for them.
Shingle roofs on commercial buildings have three paths. The inspection decides which one fits.
| Path | When It Fits | What Happens | Watch For |
|---|---|---|---|
| Coat The Shingles | Tabs flat, granules mostly on | Repairs, cleaning, approved shingle coating | Shingle maker terms |
| Repair, Then Decide | Valley or flashing leaks | Flashing and valley repair first | Hidden deck damage |
| Replace The Roof | Curled, cracked, or missing tabs | Tear-off and a new roof covering | Permit and code review |
On a shingle roof that passes inspection, a coating does a few specific things.
An approved coating adds a protective surface over shingles that still lie flat, extending a roof that would otherwise be scheduled for replacement soon.
The coating film bridges hairline gaps between tabs and around nail heads, so rain pushed by wind has fewer places to get under.
Offices and churches stay open while the coating goes on from the top, with no shingle debris in the parking lot.
A light coating reflects more sun than dark asphalt, which matters most over air-conditioned rooms.
Call and tell us how old the shingles are and where you see bare spots. That tells us whether the roof is a coating candidate at all.
A shingle job has more checks up front than a metal job. Several of them can end with a replacement recommendation.
We check each slope for curled, cracked, and missing tabs, look at granule loss, inspect valleys and step flashing, and check attic or plenum ventilation.

The shingle maker terms and the coating maker approval are reviewed, since a coating can affect shingle coverage. Code and permit questions go to the building office.

Valley and flashing repairs, sealed nail heads, and replaced tabs come first. The surface is then cleaned of dirt and loose granules.
An approved shingle coating goes on by spray or roller in stages, each one curing before the next, with extra care at the valleys.
The finished film is checked for thin spots, and gutters and downspouts are cleared of granules and overspray before the crew leaves.
Shingle roofs often share a building with metal or low-slope sections.

Many offices and churches pair a shingle main roof with a metal addition or canopy, which takes a metal coating.
Metal roof coatingLow-slope connectors between wings, where water sits after rain, take silicone.
Silicone roof coating
Where a shingle roof meets a pitched metal shop, the shop roof takes a white acrylic coating.
Acrylic roof coatingWhat owners ask before coating a commercial shingle roof in Nicholasville.
Some can, when the shingles still lie flat and the coating maker approves its product for shingles.
Before coating, check the tabs for curling and wind damage, the valleys and step flashing, attic or plenum ventilation, and the shingle maker terms. Coating extends a roof in fair condition; curled, missing, or granule-bare shingles need replacement.
By spray or roller, in stages that each cure before the next one goes on.
On metal that means primer, then reinforced detail work at laps, seams, screws, and curbs, then base and top coats. On shingles the same staging applies after repairs and cleaning, and film thickness is gauged at the end.
Expect questions about what changes: replaced panels or decking, spray foam, new gutters or edge metal, and the products going on.
Have the roof type, profile, slope, the area being replaced, and product data sheets ready. A coating that seals the existing roof without changing it draws the fewest questions.
It can, which is why the shingle maker terms are read before any coating goes on.
Some shingle makers restrict coatings or require specific products. If the roof is still under a manufacturer warranty, check those terms or contact the maker first.
Yes, when the other slopes are in different shape and each slope passes inspection on its own.
A south slope that bakes in the sun can be coated while a shaded north slope waits. The edges between them get detailed so water cannot get under the new film.

Send the roof details or call with the shingle age. If replacement is the better call, the inspection will show it.
Leave a name and number and we will call you back about the building.
Or call now: (859) 204-8094