Inspect · Repair · Coat

Nicholasville Metal Roof Coating Company

We are a metal roof coating company serving Nicholasville, Wilmore, and Lancaster. Every job runs the same way: inspect the roof, fix what failed, then coat it.

Roofer and facility manager going over a roof coating plan

How Our Nicholasville Metal Roof Coating Company Works

The panels decide the job. Coating is the last step, after rust, screws, and laps are handled.

Work truck parked beside a commercial building before roof work

We coat commercial metal roofs on warehouses, shop buildings, churches, offices, campus buildings, and farm buildings in Jessamine and Garrard counties. Silicone, acrylic, spray foam, and shingle coatings round out the work where a building needs them.

Inside Nicholasville city limits, building and electrical permits run through the city, which also posts a registration form for contractors and builders. Owners can ask the city whether a coating contractor needs to be on file before roof work starts.

  • A roof walk with photos before any price is final
  • Repairs listed separately from the coating
  • Permit questions raised before work starts
  • Photos of every problem area shared with the owner

Want Someone To Walk Your Roof?

Call to set up an inspection, or send the roof details first. The walk covers rust, screws, laps, and every penetration.

Schedule Your Free Inspection

What Our Inspection Checks

This list covers what we look at on every metal roof before recommending a coating.

  • Rust type and depth at laps, cut edges, and screws
  • Screw and washer condition across sample panel runs
  • Skylight panels, ridge caps, curbs, and gutters
  • Ceiling stains inside that point to active leaks
  • Panel undersides where access allows
  • Purlin sag and panels that flex underfoot
  • Old coatings tested for adhesion
Roofer inspecting fasteners and laps on a metal roof before coating

What We Will Not Do

Some roofs need something other than a coating. These are the cases where we say so.

If Your Roof

Shows daylight through panels across most of the roof

Widespread perforation means re-paneling. We will not coat over holes and call the roof fixed.

Start WithRe-Panel The Building
If Your Roof

Has wet insulation trapped under the surface

Sealing over wet insulation traps the water in place. Those areas get cut out and replaced first.

Start WithWet Area Replacement
If Your Roof

Is shingle with curled or missing tabs

Failed shingles need replacement, and an honest inspection says so.

Start WithShingle Replacement
If Your Roof

Drips from condensation, with no hole above

Coating the top cannot stop condensation underneath. Ventilation or insulation work is the fix.

Start WithVentilation Work

Talk To Us About Your Roof

Call or send the roof details. We will tell you plainly whether coating fits.

Call Us (859) 204-8094